The hosting capacity analysis represents the overall circuit level hosting capacity only, and does not account for all factors that could impact interconnection costs (including substation constraints). Adding complexity, theres still the human factor involved, because the numbers arent entirely accurate in all places; think of them as a guide. But after the utility corrected its hosting capacity analysis, the map showed lots of green, the paper says, indicating lots of room for solarfor example for Monterey, California, shown at right, compared to lots of red in the initial version shown above. Modeling experts could determine what those additional checks should be, the paper says. This site uses cookies. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled. Additionally, we have provided the peak substation load for the previous year. Introduction. Register with an email address to update your login credentials.
Transmission Interconnection | ComEd - An Exelon Company An expedited review of the interconnection request under Levels 1 - 3 is available provided the proposed DG facility passes the screens outlined in Part 466 and does not require construction of facilities by ComEd to protect reliability and accommodate the interconnection of the DG facility. As your last line of defense against power fluctuations and data loss, the UPS provides emergency power to run your IT equipment. That could potentially generate around 20 million kWh. ComEd Delivery Customer Class Peak Load Contributions Customer Delivery Classifications Delivery Class Code Network Peak Load Contribution (NSPL) kW Capacity Peak Load Contribution (PLC) kW Capacity Peak Load Contribution (PLC) kW. Every interconnection location must be specifically assessed through the formal interconnection process. To its merits, ILSR offers the following question to Xcel Energys refusal to follow Commission orders: as several members of the Hosting Capacity Analysis and Distribution Grid Data Security Workshop pointed out, both New York and California IOUs disclose feeder lines on their hosting capacity maps. Your contributions support local solutions. The Company continues to question the Commissions intentions and displays a general lack of urgency in this matter. PG&E, after conducting validation work, conceded that the solar results were erroneous, says the IREC paper. These next wave automation features will allow the distributed energy revolution to truly take off. I was involved in various CPUC regulatory proceedings on these maps and made the same kinds of comments frequently.
National Grid - New York System Data Portal - ArcGIS . Southern California Edisons hosting maps contain a built-in function enabling users to filter sites based on available capacity above a certain threshold. The next step beyond ensuring accuracy and actionability is automating interconnection applications based on specific map grid circuits and line sections, with click and claim capabilities that link these maps with automated interconnection portals. If you have more to contribute, please comment with a link. As it turned out, the larger-scale ground mount project was moving slowly due to local resistance. ILSR asks that the Commission provide the Company more direction, in the form of deadlines to use HCA in initial or supplemental interconnection review (in the next 18-24 months) and automating at least a portion of interconnection proceedings (by 2025) as well as staff-facilitated working groups to guide implementation. Xcel slows the adoption of cost-effective distributed generation.
ArcGIS Web Application Each township is subdivided into 36 sections (1 mile X 1 mile). Get information on current projects and opportunities. Properly designed, the hosting capacity maps offer the ability to look closely at our power grid resources. Xcel should be encouraged to update the hosting analyses monthly, or simply more regularly, he said. If you want to cooperate with us and would like to reuse some of our content, please contact:
[email protected]. The Electricity Forum (In Canada)
From schools, local government buildings and fire and police stations to offices, medical facilities and more, each facility has a room storing networking equipment or at least a small server stack. Read our policy. The resulting tools are like treasure maps for solar developers. stream
A hosting capacity map displays a high-level estimate of the available hosting capacity for adding DG. www.tdworld.com is using a security service for protection against online attacks. A decade ago, resources for scouting viable locations for new distributed energy resources (DER) simply did not exist. Oak Park, according to the PlanItGreen Report Card, a joint project of the Oak Park River Forest Community Foundation and Seven Generations Ahead, uses about 325 million kWh. For these reasons, the installed and queued DG values in the data pop-ups have been included and will be updated on a monthly basis.
However, the developers obligation to take on power grid risk slowed efficient markets from forming. The watchword is actionable. If the maps arent actionable (b/c theyre not accurate) they re actually worse than useless. Please contact our Customer Care Center if you have questions. That meant solar developers had zero access to critical power grid connection information, substation status, and other local solar plant connections. LSRV areas will display a status of Eligible on the Hosting Capacity map under LSRV Area Information. For more on LSRV, VDER and the Value stack, visit our Private Generation Tariffs page. <>
Without offering an explanation, when the final interconnection for the 200 kW project was approved, the utility assessed no new fees. These forecasts have uncertainties, such as weather and hourly load curves, as well as the typical inherent forecasting error, including, but not limited to economic drivers, customer decisions and/or behavior, and forecasted DERs. Prior to connecting, the distributed generation system owner must obtain written approval from the local utility in the form of an Interconnection Service Agreement and subsequent Authorization to Connect. Circuit level data is visible when zoomed below the sixteenth-section scale. In this role, she contributes to blog posts, podcasts, video content, and interactive features. The analyses represent the overall feeder level hosting capacity only, and do not account for all factors that could impact interconnection costs (including substation constraints).
After your application is determined to be complete, and the applicable fees are paid, ComEd will perform any necessary screening and/or studies based on the information provided as part of the application, such as specific location, generation size, and type. Based on ComEds Hosting Capacity, Oak Park could generate about 6% of its electricity from solar power located within its borders. Con Edison uses the most recent actual hourly loads to capture the Distributed Energy Resources (DER) impacts embedded in the service area to develop the load shapes for the individual networks. Applications received by ComEd without payment of the application fee will not be entered into the interconnection process for review by ComEd. A technical error has occurred. Solar hosting capacity is the gold to be found in these utility treasure maps. This data is being provided for informational purposes only and is not intended to be a substitute for the established interconnection application process. As part of the Hosting Capacity Portal we provide aggregated DG values at the substation level. 14456
Hold Ctrl or Cmd to select multiple editions. But, the paper adds, a comprehensive effort would likely include other checks not described here, as no utility claims to have performed a comprehensive validation effort. By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment. The IREC paper is titled Validation is critical to making hosting capacity analysis a clean energy game-changer.. Please note that issues related to circuit protection require further analysis to make a definitive determination of hosting capacity. The pre-application report produced by ComEd is non-binding and does not confer any rights; the potential applicant must file an application before it can interconnect with the ComEd system. The service requires full cookie support in order to view this website. As the Virginia Clean Economy Act passed last year, Dominion has a similar map now. Please enable scripts and reload this page. Commercial Solar Guy is a commercial solar developer, general contractor, and consultant. The California utility PG&Es first hosting capacity map showed little or no room for new distributed solar on 80% of its feeders, reports a paper from the Interstate Renewable Energy Council (IREC). The ComEd Energy Efficiency Program is funded in compliance with state law. Here are a few upgrades you can implement to help you get started: Airflow management - Reduce energy use up to 20% by preventing cool supply air from mixing with the hot air released from IT equipment. A PG&E spokesperson commented that To date, PG&E has connected more than475,000 solar customers to the electric grid and supports customers with resources before, during and after they go solar.. Ameren Illinois has created a one-stop shop for Renewable Energy Developers to obtain all of the information they need to begin and complete a project. The hosting capacity map utilizes the United States Public Land Survey System (US PLSS) to present results. Inaccurate results were also found in a different type of hosting capacity map produced by PG&E and two other California utilities, the IREC paper says: maps showing the capacity for added load on a circuit, such as electric vehicles. It divides the ComEd service territory into townships (6 miles X 6 miles). Our Electrical Training Institute is a leader in electrical training, through public enrolment electrical courses as well as on-line electrical training courses and webinars. For more on LSRV, VDER and the Value stack, visit our Private Generation Tariffs page. Given the proper policies and incentives, like robust hosting capacity analyses, distributed solar development can serve as a tool for economic stimulus and increased energy justice nationwide. This hosting capacity data is provided for informational purposes only and is nota substitute for the established interconnection application process. The Minnesota Public Utilities Commission has required that Xcel Energy, the largest electricity provider in Minnesota, conduct annual hosting capacity analysis reports since 2016. The highest capacity locations are seen in dark blue. To similarly incorporate hosting capacity analysis into the Xcel interconnection processs fast track screens would support the development of distributed energy resources in Minnesota by reducing costs and time for project development, and would direct project development to locations with existing grid capacity.
Service Territory | Con Edison Each Township, Section, Quarter-Section, Sixteenth-Section, or circuit is color coded based on its maximum hosting capacity value. The IREC paper advises utilities to be pro-active in ensuring the accuracy of the mapsto save time for utility customers siting and designing new solar installations, and also for utility engineers performing interconnection studies.
Xcel Energy - Hosting Capacity Map Disclaimer Illinois electric utility publishes online map of potential solar capacity Frequently Asked Questions to provide guidance to common interconnection application inquiries.
Developer Resources | Ameren Illinois - Ameren Illinois pv magazine USA offers daily updates of the latest photovoltaics news. Log in using your email address if you've already registered. You can remove a saved URL to remember another. Please see Part 466 for specific qualification requirements (screens) for each interconnection level. As a result, the smaller 200 kWac project was told that the substation was full, and that it would have to share a roughly $650,000 upgrade cost, potentially delaying the project until the upgrades were complete. Southern California Edison provides one such example of a more thorough hosting capacity map that includes criteria violation values. We publish electrical technical handbooks and associated digital magazine advertising supplements. Synchronous Generation and System Fault Current Limitations. Please be mindful of our community standards. Although the values are meant to provide the user with a general idea of availability, space on the . The Interconnection Queue Report provides the following minimum information for all Distributed Generation (Excluding Level 1 Applications) or Distributed Storage Resource Projects for which a queue position has been assigned: Each substation and feeder where an interconnection will be made is identified in the reported data by a unique index number assigned for the purpose of reporting interconnection queue information and not by any geographic or operational designation or description. The interactive map displays the highest circuit hosting capacity at the: Township, Section, Quarter-Section, Sixteenth-Section, and circuit level. Properly designed, the hosting capacity maps offer the ability to look closely at our power grid resources. Legal Notice Terms and Conditions Privacy Policy pv magazine 2023, Welcome to pv magazine USA. Touch device users, explore by touch or with swipe gestures. 1885 Clements Rd, Unit 218
View the Interconnection Queue. Your email address will not be published. Hosting Capacity is an estimate of the amount of DER that may be accommodated under current configurations at the overall circuit level without significant systemupgradesto address adverse impacts to power quality or reliability. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled. By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.
Illinois electric utility publishes online map of potential solar capacity The Company requested that the Commission excuse the complaints from the Quality of Service Plan, a request that the Commission denied. 6hA* Here are links to several Hosting Capacity Maps intended for solar developers. In practice, this is how it worked from a solar sales perspective: 1. <>/Font<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 765 990] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
Solar tower of power shows benefits of vertical installations, Court rules that inverter sizing guides grid connection, California pulls the plug on rooftop solar, Retaining value for solar customers under California NEM 3.0 rule change, U.S. Call us at 1-855-433-2700 during normal business hours to speak with a ComEd Energy Efficiency Program representative. Information for Developers of Renewable Energy. Washington, DC and part of Maryland: Potomac Electric Power Company map; Last year, ComEd in Illinois also published a hosting capacity map. Please turn on JavaScript and try again. Implementing energy-efficient equipment can help you save money and cut your energy consumption by 2040%.*. 12 of the July 2020 Order, the Commission directed the Company, to the extent practicable, show the actual locations of distribution system lines instead of broad blocks of color on the HCA map. Image: Interstate Renewable Energy Council screen capture of PG&E map. These values are representative of the total amount of DG that is installed on the feeders and networks associated with the area substation. Some locations within the PECO service territory have greater potential to support such interconnections than others. In general, this section applies to larger generators (e.g., Commercial Wind Farms, Biomass or Solar Projects). As of today, that big solar power plant is still pending, but the small one is complete. As part of changes to Rule 21, the California Public Utilities Commission is requiring utilities to use their Integration Capacity Analysis (equivalent to hosting capacity analysis) as part of the interconnection process. You may be trying to access this site from a secured browser on the server. Xcel .
Updated grid maps will offer Minnesota developers more detail on Why is Connecting Clean Energy to the Grid So Hard? You may submit your application for Level 1 Distributed Generation Interconnection or Levels 2, 3 or 4 Distributed Generation online. Each quarter section is further subdivided into sixteenth-sections (1/4 mile X 1/4 mile).
Smaller Generators | ComEd - An Exelon Company Minnesota solar companies filed 129 interconnection complaints in 2019. Uninterruptible Power Supply (UPS) When was the last time you replaced your IT closets UPS? A technical error has occurred. E999/CI20-800. However, the interconnection process stands to gain much more from hosting capacity analysis. A decade ago, resources for scouting viable locations for new distributed energy resources (DER) simply did not exist. Updates: Last updated in February/March 2017, with exception of Hosting Capacity map & supporting Portal documents. The six other states requiring hosting capacity analysis are California, Connecticut, Nevada, New Jersey, New York, and Maryland. 2016 - 2023 Consolidated Edison Company of New York, Inc. All Rights Reserved. Really hope utilities and leaders are thoughtful about more consistent updates to these portals (live data, in an ideal world) to improve results across the board. Each substation and feeder where an interconnection will be made will be identified in the reported data by a unique index number assigned for the purpose of reporting interconnection queue information hereunder, and not by any geographic or operational designation or description. As a solar developer and individual cheering for a strong power grid, few pieces of data are as useful as site data sorted by grid demand. This is necessary, because developer complaints have continued to the present. John Farrell directs the Energy Democracy initiative at the Institute for Local Self-Reliance and he develops tools that allow communities to take charge of their energy future, and pursue the maximum economic benefits of the transition to 100% renewable power. The LSRV is an added credit for DER installations in eligible areas where the utility grid would benefit from additional generation capacity. Find a viable business owner interested in solar 2. Parts of the grid that are constrained are marked with red lines (the area around number 1), while parts of the grid with available hosting capacity are marked with green and yellow lines (the area around number 2). If you have any issues viewing the data, please
Please enable JavaScript on your browser and try again. Apply Now. Electricity Forum publishes Electricity Today T&D Magazine and Intelligent Power Today Industrial Electrical Magazine. The maximum (peak) load hourly profile curve and minimum (light) load hourly profile curve are plotted on a single graph along with the capacity (in MW) of the substation supplying that network. However, if the Commission does not apply greater pressure for action, hosting capacity may continue to be a largely performative exercise without providing tangible benefits to Minnesota stakeholders and electric customers. A technical error has occurred.
The Commonwealth of Massachusetts According to ComEd's description, "Hosting Capacity is an estimate of the amount of DER [distributed energy resources] that may be accommodated under current configurations at the overall circuit level without significant system upgrades to address adverse impacts to power quality or reliability." It looks like your browser does not have JavaScript enabled. The analyses presented in these displays provide the feeder level hosting capacity for the distribution circuits evaluated. ComEd anticipates that the Interconnection Queue data will typically be updated monthly. . The provision of this data would support using hosting capacity analysis in the place of initial review screens for interconnection processing, which the Commission adopted as a long-term goal in the July 2020 order. endobj
Integrating hosting capacity analysis with the interconnection process is not only possible, it is already being done. The library zone below is used to load resources. SDG&Es HCA tool allows users to see hourly changes in load capacity., IRECs recommendations apply to both solar hosting capacity and load hosting capacity. Head over to BusinessTypes or PublicSector for energy-reducing ideas specific to your organization. Questions? The hosting capacity map is offered free of charge and correspondingly is not as accurate as the next steps for obtaining more specific information. Each section is further subdivided into quarter-sections (1/2 mile X 1/2 mile). It looks like your browser does not have JavaScript enabled. Be aware of your private generation configuration options and system limitations. You will be redirected once the validation is complete. Legal Notice Terms and Conditions Privacy Policy pv magazine 2023, Welcome to pv magazine USA. www.tdworld.com is using a security service for protection against online attacks. Please enable scripts and reload this page. The library zone below is used to load resources. Where applicable, ComEd will offer an interconnection agreement. The Hosting Capacity map gives an indication of how much generation (expressed in kW) can be added to a feeder before the feeder reaches capacity or other limitations that reduce the reliability of service to electric customers on the feeder. Xcel could do more to advance toward the ultimate goal: delivering its customers more cost-effective clean energy by integrating hosting capacity analysis with the interconnection process. Going significantly beyond this amount would likely require a combination of upgrades by ComEds infrastructure, potentially higher interconnection costs and deployment of technologies like energy storage. The IREC paper describes how some utilities have worked to ensure accurate inputs to their hosting capacity analysis, and use automated flags to identify anomalous modeling results.
Hosting capacity maps: A gold mine for solar developers You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. If you are considering the option of connecting a generator to a utility's electric distribution system, you must meet certain requirements before moving forward. PECO is committed to providing safe and reliable service for customers while also supporting the interconnection of customer-owned renewable energy and Distributed Energy Resources (DER), like solar. The procedures for interconnection are divided into four levels as follows: Generally speaking, DG facilities that are certified by nationally recognized testing laboratories and meet certain standards of the Institute of Electrical and Electronics Engineers (IEEE), Underwriters' Laboratory, and the National Electrical Code, may qualify for interconnection under an expedited review process provided for in Levels 1 - 3. Your email address will not be published. A potential applicant may submit a formal written request form along with a non-refundable fee for a pre-application report on a proposed project at a specific site. While hosting capacity analysis can be valuable as a data point, it could be an even better tool for distributed solar adoption. E999/CI20-800, rule whether Xcel Energy must comply with Order Point 12 of the July 2020 order. Solar hosting capacity is the gold to be found in these utility treasure maps. Grid security is a vital issue, but we fear it may serve as an excuse to further delay the interconnection of distributed generation. Also, the map is taken from data as of a point in time and updated as of the date indicated in the pop-up display on the map, and therefore may not reflect current conditions in a given area. The map sections indicate potential capacity by AC kilowatts with a link to to ComEds recently upgraded Interconnection and Net Metering homepage. Fax 905-686-1078
Alice Howland Obituary,
East Hampton Press Classifieds,
Articles C